Production line of Continuous Fiber Reinforced Thermoplastic Composite Unidirectional Tape
Production Line for CFRT or CFRTP tapes
In short, what we could provide:
1 |
Continuous Fiberglass Reinforced Thermoplastic products, including
--Unidirectional tapes
--laminate
--sandwich panel
etc. |
2 |
Machinery line, which could produce the above products |
3 |
Factory construction guidance, from 0 to a functioning factory. |
Product Specifications and Requirements
1. The inner width of the mold door width is 1300mm, and the guaranteed width of the finished product door width is 1250mm.
2. The thickness of the acceptance sheet is 0.3mm±0.02mm, the adjustable range of PP belt thickness is 0.26-0.4mm, and the adjustable range of glass fiber content is 50%-65%.
3. The production speed is 8-12m/min, and the design maximum speed is 12m/min.
4. Appearance requirements for acceptance sheet:
The surface of the strip is flat and smooth, the glass fiber is evenly distributed, no glass fiber is exposed, and the thickness is uniform;
The glass fiber is completely covered by resin impregnation without dry yarn.
The CFRTP Continuous Unidirectional Tape Production Line is a full set of production equipment, including the creel unit, the traction unit, extruder unit, dipping unit, the compounding unit, the flattening unit, the winding unit, the electrical control system.
Item |
Machine list |
1 Creel Unit |
Fiberglass Creel, Yarn bobbins. |
2 Traction Unit |
rubber rolls, mirror grinding rolls, cylinders, and geared motors. |
3 Extruder and Dipping Unit |
Single Screw Extruder, main motor |
4 Mold |
One set of extrusion mold and one set of the impregnation mold |
5 Laminator Unit |
mirror roller, servo motor, cylinder, oil station, double modulus water temperature machine, Industrial chiller |
6 Flattening Unit |
rubber rolls, cylinders, geared motor, Waste edge winder, and Motor trimming device. |
7 Winding Unit |
single station finished winding machine, gas expansion shaft, |
8 Electric Control system |
electrical control cabinet, touching screen, the control panel in the screen is displayed in English. |
Equipment Terms of Service
1. Equipment Warranty: Calculated from the day the equipment is delivered to the customer's factory for installation, the warranty period is one year.
2. Equipment installation: If the on-site installation is required, the buyer is responsible for all round-trip expenses for commissioning personnel and all expenses incurred during the installation process; the buyer must fully cooperate, including relevant water, electricity, gas requirements, and related tools.
3. After the warranty period, the supplier will provide preferential spare parts supply.
4. During the warranty period, the supplier is responsible for free replacement of the normal damage of non-wearing parts (non-human or improper operation).
5. The supplier provides long-term technical consulting services.
Besides the above CFRT Production line machine list, we are also responsible for the following service:
1:Technical Service
2:Operation instruction
3:Installation of the whole equipment
4:Operation of the whole production line
5:technical training and operation training, free of charge.
6:after sale service
You only need to provide:
1: Necessary basic work on the spot.
2: Power supply, water supply.
3: Electrical installation
4: Compressed air pipes
5: Fixed bolts and other fixing and installation of mechanical equipment
6: raw material for equipment's installation and operation
7: Lighting for the production line.
8: tools for installation such as welding machine, angle grinder, level....
9:legal license
.....
If you are not sure, contact us, and we can provide technical support for factory construction.