Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line

Product Details
Customization: Available
After-sales Service: Lifetime Technical Consulting Service
Warranty: 1 Year
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 USD
Plant Area
>2000 square meters
  • Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line
  • Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line
  • Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line
  • Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line
  • Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line
  • Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line
Find Similar Products

Basic Info.

Model NO.
Ud Tape Production Line
Product Type
Glass Fiber Ud Tape
Board Layers
Single Plate
Screw No.
Single Screw Extruder or Twin Screw Extruder
Automation
Automatic
Computerized
Computerized
Customized
Customized
Condition
New
Keyword
Thermoplastic Ud Tapes Machine
Transport Package
Factory Standard Packaging Wooden Packing
Specification
fiber glass tape width: 1300mm
Trademark
AB Composite
Origin
Qingdao, China
HS Code
847720900
Production Capacity
3tons/24hrs

Product Description


CFRP CFRTP Prepreg UD Tape Melt Pre-impregnation Prepreging Machine Line

In short, what we could provide:
 
1 Continuous Fiberglass Reinforced Thermoplastic products, including
--Unidirectional tapes
--laminate
--sandwich panel
etc.
2 Machinery line, which could produce the above products
3 Factory construction guidance, from 0 to a functioning factory.

Cfrp Cfrtp Prepreg Ud Tape Melt Pre-Impregnation Prepreging Machine Line

Using extrusion melt impregnation process produce for PP PE PA + continuous glass fiber reinforced thermoplastic unidirectional tape production line

1. The inner width of the mold door width is 1300mm, and the guaranteed width of the finished product door width is 1250mm.
2. The thickness of the acceptance sheet is 0.3mm±0.02mm, the adjustable range of PP belt thickness is 0.26-0.4mm, and the adjustable range of      glass fiber content is 50%-65%.
3. The production speed is 8-12m/min, and the design maximum speed is 12m/min.
4. Appearance requirements for acceptance sheet:
     The surface of the strip is flat and smooth, the glass fiber is evenly distributed, no glass fiber is exposed, and the thickness is uniform;
     The glass fiber is completely covered by resin impregnation without dry yarn.


 
Item Machine list
1 Creel Unit Fiberglass Creel, Yarn bobbins.
2 Traction Unit rubber rolls, mirror grinding rolls, cylinders, and geared motors.
3 Extruder and Dipping Unit Single Screw Extruder, main motor
4 Mold One set of extrusion mold and one set of the impregnation mold
5 Laminator Unit mirror roller, servo motor, cylinder, oil station, double modulus water temperature machine, Industrial chiller
6 Flattening Unit rubber rolls, cylinders, geared motor, Waste edge winder, and Motor trimming device.
7 Winding Unit single station finished winding machine, gas expansion shaft, 
8 Electric Control system electrical control cabinet, touching screen, the control panel in the screen is displayed in English.


Equipment Terms of Service
1. Equipment Warranty: Calculated from the day the equipment is delivered to the customer's factory for installation, the warranty period is one year.
2. Equipment installation: If the on-site installation is required, the buyer is responsible for all round-trip expenses for commissioning personnel and all expenses incurred during the installation process; the buyer must fully cooperate, including relevant water, electricity, gas requirements, and related tools.
3. After the warranty period, the supplier will provide preferential spare parts supply.
4. During the warranty period, the supplier is responsible for free replacement of the normal damage of non-wearing parts (non-human or improper operation).
5. The supplier provides long-term technical consulting services.


You only need to provide:
1: Necessary basic work on the spot.
2: Power supply, water supply.
3: Electrical installation
4: Compressed air pipes
5: Fixed bolts and other fixing and installation of mechanical equipment
6: raw material for equipment's installation and operation
7: Lighting for the production line.
8: tools for installation such as welding machine, angle grinder, level....
9:legal license
.....



If you are not sure, contact us, and we can provide technical support for factory construction.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier